news
Buffalo Riders Face Transit Disruptions on Metro Rail and Bus Routes
Single-tracking, reroutes and construction reshape commutes near Canalside and downtown stations
How we reported this

Metro Rail is single-tracking above ground between Church and Canalside stations, with trains arriving every 20 minutes while the DL&W Station remains open. Buses on routes 6, 15 and 42 will be rerouted around I-190 and the Buffalo Skyway starting at 8am on July 19, 2026, for the GoBike Buffalo Skyride. Routes 8 (Main) and 24 (Genesee) have already shifted due to Heritage Point construction near Canalside that began June 8, 2026.
Why these changes matter now
The adjustments coincide with summer events and ongoing work along key downtown corridors. Riders who rely on the system for work, errands and connections to other parts of the city must plan extra time for altered schedules and detours. Metro Rail remains free for above-ground downtown travel, though a small fare applies when traveling underground past the Theatre District.
Local detail on affected routes and stations
Travelers using the Metro Rail between Church and Canalside encounter longer waits because of the single-track operation. The DL&W Station stays available as an option. Bus users on routes 6, 15 and 42 encounter changes around I-190 and the Buffalo Skyway during the July 19 event. Routes 8 and 24 continue on modified paths linked to the Heritage Point site near Canalside.
Broader costs of congestion
Traffic congestion costs Buffalo-Niagara drivers $932 annually and 40 hours per year in lost time, with 40% of major roads in poor or mediocre condition. These figures illustrate the daily pressure on the transportation network when rail and bus services face temporary limits.
Commuters can check current schedules through the NFTA Metro Rail site and local transit apps before heading out. Updates on specific reroutes will continue to appear on official transportation pages as conditions evolve.